top of page

From Department Spreadsheets to Real-Time Budgeting at a Museum

Industry:
Solution:
Client:
Arts & Cultural
Workday Adaptive Planning
Museum

The Challenge

A budgeting process split across disconnected department spreadsheets

Arts and cultural organizations run on a rhythm that's far more granular than the annual or monthly budgets most planning tools are built around. A single sold-out weekend or a rained-out day can swing a month's numbers significantly, so attendance and revenue often need to be planned at a daily level rather than a monthly average.


For one museum, that level of detail was difficult to manage. Planning was done entirely in Excel, with each department building its own separate model and sending finished results to FP&A.


FP&A then had to manually stitch everything together into a single consolidated budget file. Planning daily attendance and revenue in spreadsheets was cumbersome and tedious, and personnel budgets had to be entered department by department.


Leadership couldn't see the full budget until that manual consolidation was finished.


The museum needed a shared planning model built around how the organization actually operates.

Our Approach

Building one shared model around how the museum plans

Ascend worked with the museum to replace its collection of department-level spreadsheets with a single, connected planning model in Workday Adaptive Planning. Rather than forcing the museum's operations into monthly averages, the model was designed to plan at the level of detail the organization actually needs.


Every department now plans in the same environment, so the budget comes together as it is built instead of after the fact.

The Solution

Putting daily detail and consistent inputs into a single planning model. Ascend configured Adaptive Planning around the museum's most important planning drivers.


Daily Attendance and Revenue Planning

Models were built to plan attendance and revenue at the daily time stratum, something that had been cumbersome and tedious in Excel but became straightforward in Adaptive.


Position- and Title-Based Salary Rates

Default salary rates were configured by position and title, making personnel budget entry fast and consistent across departments.


Automatic Consolidation

Because every department plans in one connected model, results consolidate automatically as soon as they're saved, eliminating the manual stitching of department files.

The Results

Easier budget entry and real-time visibility for leadership

The new planning environment changed how the museum builds and reviews its budget.


Daily

Attendance and revenue planning, replacing monthly averages and tedious spreadsheet work


1 shared model

Replacing separate department spreadsheets and a manually consolidated budget file


Real-time

Consolidated budget review and reporting for leadership as soon as plans are saved


Instead of waiting on FP&A to manually consolidate department submissions, leadership can review and report on the budget in real time.

The Impact

From manual consolidation to a connected, real-time budget

Workday Adaptive Planning gave the museum a planning process that matches the rhythm of its operations.


By planning attendance and revenue at a daily level and standardizing personnel inputs by position and title, the finance team can build a more accurate budget with far less manual effort.


The result is a budget that consolidates as it's built, giving leadership timely visibility without the delays of stitching spreadsheets together.

Ready to Move Beyond the Spreadsheet?

See how Ascend Planning Solutions can help your organization bring attendance, programming, and membership data into one connected planning model.

bottom of page